Functies
Bekijk een resultaat Oplossingen Blog (FR) Demo aanvragen
Demo aanvragen

Prijsopgave pricing powered by market data

Upload uw hoeveelhedenstaat (PDF of Excel). Doaken extraheert de posten, vergelijkt uw eenheidsprijzen met gegevens van 367.000+ gegunde opdrachten (data.gouv.fr) en berekent uw K-coëfficiënt in realtime. U identificeert afwijkingen vóór indiening — niet erna.

Demo aanvragen
367K+
Contracts compared
367K+
Contracts on data.gouv.fr
40-60%
Score = price of services
app.doaken.fr / Prijsopgave
40 to 60% of the final score depends on pricing. Compare your prices before submitting.
K Coefficient 1.25
Description Qty Unit Ref. UP Final UP
Concrete C25/30 45 m3 185,00 231,25
Rebar steel 3,2 t 1 850,00 2 312,50
Fair-faced formwork 280 m2 42,00 52,50
Earthworks ALB risk 320 m3 28,00 35,00
Estimated total excl. VAT --

What Doaken detects

Real result from a structural works lot — school rehabilitation, 127 lines extracted.

Lines extracted
Lot 1 — Demolition34 lines
Lot 2 — Structural works58 lines
Lot 3 — Timber frame35 lines
Total127 lines
Price alerts
Concrete C25/3028 vs 42 /m3
Roof waterproofing32 vs 48 /m2
Gaps detected compared to prices observed on awarded contracts (data.gouv.fr).
K Coefficient
Overhead costs12%
Contingencies3%
Profit margin8%
K Coefficient1.25
400+
reference prices per trade
367K+
contracts listed on data.gouv.fr
40-60%
of the final score = price of services

What slows down your pricing teams

Manual re-entry

The bill of quantities arrives in PDF or Excel with a different format for every tender. Uw teams besteden hours re-entering line items into their own spreadsheet before even starting to price.

Data entry errors

A misplaced decimal, a confused unit, a price copied to the wrong line. On 200 items, the slightest error ends up in the final amount and can cost you the contract.

No price benchmark

Your unit prices are based on internal experience, with no market reference. No way to know if you are above, below, or within the range of awarded contracts.

From raw bill of quantities to reliable pricing

1

Import bill of quantities

Upload the file as-is (PDF or Excel). Doaken detects the table structure and extracts each line: description, quantity, unit.

2

Price comparison

Each unit price is compared against historical data from 367,000+ awarded public contracts (data.gouv.fr). Significant gaps trigger a visual alert.

3

Adjustment and export

Define your K coefficient (overhead, contingencies, margin), adjust prices, and integrate the pricing into the submission package.

40 to 60% of the final score depends on the price of services. Structured, benchmarked pricing protects your margins as much as it protects your competitiveness.
Demo aanvragen

What it changes for your pricing team

More tenders priced

Automatic extraction eliminates re-entry. Your teams price the tenders they didn't have time to handle.

Zero ALB risk

Price alerts detect amounts below the market threshold before submission. You avoid justification requests for abnormally low bids.

Profit margins protegees

The K coefficient breaks down your overhead, contingencies and margin. You see the impact on each item before locking in prices.

Team focused on strategy

No more re-entry and manual checks. Your estimating team focuses on pricing strategy and negotiation.

Everything about bill of quantities pricing

Which bill of quantities formats are supported?
Doaken accepts bills of quantities in PDF and Excel (.xls, .xlsx) formats. The platform automatically detects the table structure (description, quantities, units, unit prices) regardless of the format used by the buyer. No prior conversion is needed.
Hoe vergelijkt Doaken mijn prijzen met de markt?
U uploadt uw hoeveelhedenstaat en uw eenheidsprijzen (uw interne prijsdatabase). Doaken vergelijkt ze met historische gegevens van 367.000+ gegunde opdrachten (data.gouv.fr). U ziet onmiddellijk of uw prijzen binnen de marktmarge liggen, erboven of eronder. Als een prijs significant laag is, waarschuwt een melding u voor het risico van een abnormaal lage inschrijving.
How does the K coefficient work?
The K coefficient groups your overhead costs, contingencies and profit margin. Doaken lets you define each component and calculates the overall coefficient. It is automatically applied to all your reference unit prices to obtain your selling prices. You can adjust the K by lot or by item according to your strategy.
Do the alerts detect abnormally low bids?
Yes. Doaken compares each entered unit price against the market range. If a price is significantly below the threshold observed on awarded contracts, a visual alert warns you. This protects against the risk of an abnormally low bid, which can trigger a justification request or elimination.
Is the pricing exportable for submission?
Yes. The finalized pricing in Doaken is integrated into the complete submission package. During ZIP export, the priced bill of quantities is included in the format expected by the buyer, along with the technical proposal and administrative documents. Everything is ready for submission on the e-procurement platform.
Can multiple people work on the same pricing?
Yes. Multiple team leden can work on the same pricing. Each change is tracked with the author and timestamp. You can view the complete version history and restore a previous version if needed.

See the actual result on a real public tender:

See a full example

Ready to secure your pricing?

Upload a real bill of quantities, compare your prices to market references. Results in real time.

Demo aanvragen
Demo aanvragen

Demo aanvragen

Reactie binnen 24 uur · Persoonlijke demo · Vrijblijvend